Product Details:
Payment & Shipping Terms:
|
Producing Length: | 200-400mm | Producing Width: | 270-330mm |
---|---|---|---|
Film Thickness: | 0.008-0.02mm | Producing Speed: | 40-200pcs/min |
Main Power: | 10 Kw | G. Power: | 4Kw |
Weight: | 600Kg | ||
High Light: | disposable gloves making machine,surgical gloves manufacturing machine |
Disposable Glove Making Machine
Performance and Characteristics
The disposable glove machine is successfully researches and developed by our factory through accumulating many years of experience in the production of high and low pressure bag-making machines.Replacing the original electric heating wire model homemade equipment,it has advantages such as stable product quality,automatic control,easy to operate and maintenance. It is the ideal equipment for batch production of HD/LDPE film gloves.The main power of the machine adopts inverter motor with stable performance and low noise.The control part adopts single chip microcomputer control, and adopt stepping motor and actuator, which have such advantages as low maintenance rate and low noise.
Main Technical Variables
item | kw | qty | origin |
Servo motor | 1.5kw | 1 | china |
Speed Controller | 600W | China | |
Unwinder Photocell | 1 | China | |
Main Motor | 10kw | 1 | china |
computer | 1 | china | |
inverter | 1.5kw | 1 | china |
Inverter | 0.75kw | 2 | china |
Feeding motor | 0.37kw | 2 | china |
Company profile:
We Have lots of kind making machine such as plastic shoes cover machine, non-woven shoes cover making machine, boot cover making machine, plastic bath tub /massage tub /anti-dust cover making machine, doctor cap making machine, anti-dust mask making machine, steering wheel cover making machine and pot cover making machine.
We have more than 20 years experience in making equipment of disposable medical covers and health products. We have more than 2 invent patent, and 10 new design patent.
We are absolutely your trustworthy partners. Any questions you need are welcome to consult us.
TERMS & CONDITIONS:
|
One Month |
|
Effected within 30 days from the date of signing the purchase contract and receipt of T/T affected for advance payment. |
|
Ningbo Port |
|
Effect payment by T/T in two installments exactly 30% advance payment and remaining 70% payment before shipment |
|
100% brand new |
|
China. |
|
Wooden Pallet Packing |
|
Installation and Adjusting: If required, the seller will dispatch the technician to your country for installation, adjusting the machine and training the workers at your plant. This price is inclusive of the fee of installation and debugging. However the buyer should take on all costs required during our technician’s stay in the buyer’s country, including round airplane tickets, accommodation, and food . |
FAQ
Question | Answer |
1. How long will your engineer reach our factory? | Within one week after machine arrival your factory. |
2. How many days will you finish installing? | We will finish installation and training within 15days. |
3. What should we charge for your engineer? | You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person. |
4. How long is your machine's warranty period? | All our machine have one year guarantee, starting from finished installation. |
5. How could we do after one year warranty period? | We also can do service for you, but you need pay salary for my technician 100USD/day. |
6. How could we do if the parts broken within warranty? | We would express the free replacement parts during the warranty date. |